Crankshaft lines, GM, Silao (MX)

At GM in Silao, Mexico, we programmed and commissioned two crankshaft lines. The production line includes complete process from the raw part to the finished part.

Technical Details

Project

  • Fully automated production line for crankshafts
  • PLC and NC programming
  • Project coordination and customer training

Installation

  • 34 H-Gantries and 10 I-Gantries
  • 2 FANUC robots
  • Conveyors for buffering
  • SPC and NOK drawers
  • Loading and unloading various tooling machines

Controls

  • 30x SINUMERIK 840D sl
  • WinCC panels for visualization

Features

  • Fully automated process
  • Conveyors with SPC and NOK loops
  • Cycle time 72 seconds
Click to access the login or register cheese